PM-L3 | إدارة المشروعات – المستوى الثالث | Project Management – Level 3
PM-L3 Project Management – Level 3 is an advanced, 100% online, self-paced CPD course from COMFORT-CPD Academy, with Arabic video lessons and illustrated bilingual lesson PDFs. It teaches how to manage a building or real-estate development project from the client's side, from the brief to close-out, in five modules: Initiation & Governance, Scope & Time Planning, Cost & Value Control, Procurement, Contracts & Risk, and Delivery, Quality & Close-out — and every lesson ends with the working project document that step produces. 5 modules, 25 lessons, 50 training hours, a case study, an applied test and a 20-question final exam. Digital certificate of completion with 5 CPD hours. 30-day access. A tailored corporate programme (online or in-person) is available by proposal.
«إدارة المشروعات – المستوى الثالث» (PM-L3) برنامج CPD متقدم أون لاين بالكامل وبوتيرة ذاتية من أكاديمية كومفورت للتطوير المهني المستمر، بفيديوهات دروس بالعربية وملفات PDF مصوّرة ثنائية اللغة. يدرّس إدارة مشروع البناء أو التطوير العقاري من جانب المالك، من موجز المشروع إلى الإغلاق، في خمس وحدات: بدء المشروع والحوكمة، وتخطيط النطاق والزمن، وضبط التكلفة والقيمة، والتعاقد والعقود والمخاطر، والتنفيذ والجودة والإغلاق — وينتهي كل درس بمستند المشروع العملي الذي تُنتجه الخطوة. 5 وحدات و25 درسًا و50 ساعة تدريبية ودراسة حالة واختبار تطبيقي واختبار نهائي من 20 سؤالًا. شهادة إتمام رقمية بواقع 5 ساعات CPD. إتاحة 30 يومًا. ويتوفر برنامج تدريبي مخصص للشركات (أونلاين أو حضوري) بعرض مكتوب.
Project Management for Building & Development Projects
A building project rarely fails on site. It fails earlier — in a brief with no measurable objectives, a programme with no logic, a budget with no contingency, a change agreed by word of mouth, a notice sent a week late. This course teaches the complete project-management cycle of a building project from the client's side, from the brief to close-out, on one fictional office building followed through five modules — and every lesson ends with the working project document that step produces.
قلّما يفشل مشروع البناء في الموقع؛ إنه يفشل قبل ذلك — في موجز بلا أهداف قابلة للقياس، وبرنامج زمني بلا منطق، وموازنة بلا احتياطي، وتغيير اتُّفق عليه شفاهةً، وإخطار أُرسل متأخرًا أسبوعًا. يدرّس هذا البرنامج دورة إدارة مشروع البناء كاملة من جانب المالك، من موجز المشروع إلى الإغلاق، على مبنى إداري افتراضي واحد يُتابَع عبر خمس وحدات — وينتهي كل درس بمستند المشروع العملي الذي تُنتجه الخطوة.
Five Modules, One Project — From the Brief to the Close-out
Most project trouble is ordinary. A scope that grew because nobody wrote down what was out. A completion date fixed before the logic was drawn. A contingency spent without a single change number. A contractor chosen on price alone. A claim lost because the notice came late. A handover delayed by defects that should have been caught at a hold point. None of these needs a genius to prevent it; each needs a method and a document, used at the right moment by the person who owns it.
This course follows one project through the whole cycle. Module 1 authorises and organises it. Module 2 defines the scope and builds the programme. Module 3 plans and controls the money. Module 4 buys the works, administers the contract and manages the risks. Module 5 builds it right, hands it over and closes it out. Each lesson ends with the form, register or schedule that the step produces — so the learner leaves with a working project file, not only notes.
معظم متاعب المشروعات عادية. نطاق اتّسع لأن أحدًا لم يكتب ما هو خارجه. تاريخ إنجاز حُدِّد قبل رسم منطق البرنامج. احتياطي طوارئ أُنفق بلا رقم تغيير واحد. مقاول اختير بالسعر وحده. مطالبة ضاعت لأن الإخطار تأخر. تسليم تعطّل بعيوب كان يجب كشفها عند نقطة توقف. لا يحتاج منع أيٍّ من ذلك إلى عبقرية؛ يحتاج إلى منهج ومستند يُستخدمان في اللحظة الصحيحة على يد صاحب المسؤولية.
يتابع البرنامج مشروعًا واحدًا عبر الدورة كلها. الوحدة 1 تعتمده وتنظّمه. الوحدة 2 تحدد النطاق وتبني البرنامج الزمني. الوحدة 3 تخطّط المال وتضبطه. الوحدة 4 تتعاقد على الأعمال وتدير العقد والمخاطر. والوحدة 5 تنفّذ العمل صحيحًا وتسلّمه وتُغلق المشروع. وينتهي كل درس بالنموذج أو السجل أو الجدول الذي تُنتجه الخطوة — ليخرج المتدرب بملف مشروع عملي لا بملاحظات فقط.
The worked case, “Palm Court Offices”, is a fictional, illustrative office building; all amounts (EGP, m = million), percentages, dates and contract terms are teaching values, not data from any real project, owner, contractor or contract. · المثال التطبيقي «بالم كورت» مبنى إداري افتراضي؛ وجميع المبالغ والنسب والتواريخ وشروط العقد قيم تعليمية وليست بيانات أي مشروع أو مالك أو مقاول أو عقد حقيقي.
خطِّط مرة… وقِس كل شهر… وغيِّر كتابةً… وأغلِق كما يجب.
Built for the People Who Run the Project for Its Owner
This course is for those who answer to the owner for the time, the cost and the quality of a building project — and for those who are about to.
Client-Side Project Managers
Planning, coordinating, controlling and reporting a building project for its owner — the core audience of the course.
Developers' Project Teams
Project engineers, planners and coordinators who run the programme, the cost report and the change log every month.
Owners' Representatives
Those who speak for the owner to the design team and the contractor and must know what to approve and what to escalate.
Engineers Moving into Project Management
Site and design engineers who are taking on time, cost, contract and risk responsibilities for the first time.
Architects Moving into Project Management
Architects and design managers who want to lead the whole project, not only its drawings.
Valuers Who Oversee Projects
Valuers who monitor projects under construction and need to read a programme, a cost report and a certificate.
Asset Managers Who Oversee Projects
Asset and property managers responsible for refurbishment, fit-out and new-build projects in their portfolio.
Companies Training a Project Team
Owners and developers who want one common method and one set of project documents across their team.
5 Modules · 25 Lessons — The Project from Brief to Close-out
Five modules of 10 training hours each. Every lesson has an Arabic video and an illustrated bilingual PDF with a visual guide, a working project document and a self-scoring quiz.
Initiation & Governance
Life cycle · Business case · Stakeholders · Authority matrix · Charter🕒 10 training hours · 5 lessons · 10 ساعات تدريبيةWhere the project is either set up to succeed or left to drift: the life cycle of a building project and its stage gates; the business case that says why and the brief that says what; the stakeholders and the communication plan; the parties, the contract lines, the RACI chart and the authority matrix for changes; and the charter and the execution plan that fix the baselines before a single order is placed.
- 1.1The Project Life Cycle — what makes a project, the six stages of a building project from brief to close-out, the stage gates where the client decides to go, revise or stop, the scope–time–cost triangle with quality at its centre, and the role of the client-side project manager · دورة حياة المشروع — ما الذي يجعل العمل مشروعًا، والمراحل الست لمشروع البناء من الموجز إلى الإغلاق، وبوابات المراحل التي يقرر عندها المالك المضيّ أو المراجعة أو الإيقاف، ومثلث النطاق والزمن والتكلفة وفي مركزه الجودة، ودور مدير المشروع من جانب المالك
- 1.2The Business Case and the Brief — the business case answers why (the need, the options, the cost, the benefit and the risks), the brief answers what (measurable objectives, area schedule, quality level, budget and key dates), and both are re-checked at every gate · دراسة الجدوى وموجز المشروع — دراسة الجدوى تجيب عن «لماذا» (الحاجة والبدائل والتكلفة والعائد والمخاطر)، وموجز المشروع يجيب عن «ماذا» (أهداف قابلة للقياس وجدول المساحات ومستوى الجودة والموازنة والتواريخ الرئيسية)، ويُعاد فحصهما عند كل بوابة
- 1.3Stakeholders and Communication — identifying everyone who can affect the project or is affected by it, placing them on the power / interest grid, counting the communication channels with n(n−1)÷2, and writing the communication plan and the live stakeholder register · أصحاب المصلحة والتواصل — تحديد كل من يؤثر في المشروع أو يتأثر به، ووضعهم على مصفوفة القوة والاهتمام، وحساب قنوات التواصل بالمعادلة n(n−1)÷2، وإعداد خطة التواصل وسجل أصحاب المصلحة كمستند حيّ
- 1.4Organisation, Roles and Authority — the parties and who has a contract with whom, instructions that follow the contract lines, the RACI chart with one accountable person per decision, the authority matrix for changes and what the steering committee decides · التنظيم والأدوار والصلاحيات — الأطراف ومن يتعاقد مع من، والتعليمات التي تسير على خطوط التعاقد، ومصفوفة المسؤوليات بمسؤول واحد عن كل قرار، ومصفوفة صلاحيات التغيير وما تقرره اللجنة التوجيهية
- 1.5The Charter and the Execution Plan — the one-page charter that authorises the project and sets its success criteria, the execution plan that says how the project will be run, the licence file complete before work starts, and baselines that change only through change control · ميثاق المشروع وخطة التنفيذ — الميثاق في صفحة واحدة يعتمد المشروع ويحدد معايير نجاحه، وخطة التنفيذ تبيّن كيف سيُدار المشروع، وملف التراخيص مكتمل قبل بدء العمل، وخطوط أساس لا تتغير إلا عبر ضبط التغيير
Scope & Time Planning
WBS · Activity list · Critical path · Float · Baseline programme · Recovery🕒 10 training hours · 5 lessons · 10 ساعات تدريبيةA programme is an argument, not a picture. This module builds it step by step: the scope statement and the work breakdown structure with its 100% rule; activities, logic links and durations, including the three-point estimate; the forward and backward pass, the critical path and float; resources, levelling, milestones and the approved baseline; and progress measured by rules, the look-ahead programme and the recovery plan when the critical path slips.
- 2.1Scope and the Work Breakdown Structure — the scope statement (what is in, what is out, the deliverables and the acceptance criteria), the work breakdown structure and its 100% rule, the WBS dictionary for each package, and how scope creep starts · النطاق وهيكل تجزئة العمل — بيان النطاق (ما يدخل وما لا يدخل والمخرجات ومعايير القبول)، وهيكل تجزئة العمل وقاعدة المئة بالمئة، وقاموس الهيكل لكل حزمة عمل، وكيف يبدأ زحف النطاق
- 2.2Activities, Logic and Durations — turning packages into activities with one owner each, linking them with finish-to-start, start-to-start and finish-to-finish logic, leads and lags, and estimating durations from output rates and the three-point estimate · الأنشطة والتتابع والمدد — تحويل حزم العمل إلى أنشطة لكل منها مالك واحد، وربطها بعلاقات نهاية–بداية وبداية–بداية ونهاية–نهاية، وفترات التقديم والتأخير، وتقدير المدد من معدلات الإنتاج والتقدير الثلاثي
- 2.3The Critical Path — the forward pass and the backward pass, float as the difference between the earliest and the latest dates, the longest chain that fixes the completion date, and why near-critical activities are watched as closely as critical ones · المسار الحرج — المرور الأمامي والمرور الخلفي، وفترة السماح كفرق بين أبكر التواريخ وآخرها، وأطول سلسلة أنشطة تحدد تاريخ الإنجاز، ولماذا تُراقَب الأنشطة شبه الحرجة كما تُراقَب الحرجة
- 2.4Resources and the Baseline Programme — loading labour, plant, key materials and long-lead items onto the programme, the histogram and resource levelling inside float, the milestones, and the approved baseline against which every progress report is measured · الموارد والبرنامج الزمني المعتمد — تحميل العمالة والمعدات والمواد الرئيسية والبنود طويلة التوريد على البرنامج، ومخطط الموارد وتسويتها داخل فترة السماح، والمعالم الزمنية، وخط الأساس المعتمد الذي يُقاس عليه كل تقرير تقدم
- 2.5Progress Measurement and Recovery — measuring progress by rules rather than opinion, the look-ahead programme agreed weekly with the contractor, recovery by crashing the cheapest critical activity, and why updating the programme is not re-baselining · قياس التقدم وخطة الاستدراك — قياس التقدم بقواعد لا بآراء، والبرنامج التفصيلي قصير المدى المتفق عليه أسبوعيًا مع المقاول، والاستدراك بضغط مدة أرخص نشاط حرج، ولماذا لا يُعد تحديث البرنامج تغييرًا لخط الأساس
Cost & Value Control
Cost plan · Cash flow · Earned value · Change control · Value engineering🕒 10 training hours · 5 lessons · 10 ساعات تدريبيةEvery month on the programme carries money. This module plans and controls it: the cost plan that follows the work breakdown structure, with contingency and management reserve kept apart; the S-curve, the advance payment, retention and the interim payment certificate; earned value management — variances, indices and the forecast at completion; change control from request to instruction; and value engineering and the monthly cost report.
- 3.1The Cost Plan and the Budget — from an order-of-cost estimate to the elemental cost plan that follows the WBS, fees and permits, contingency against management reserve, the cost per square metre, and a cost baseline approved together with the programme · خطة التكلفة والموازنة — من التقدير الأولي للتكلفة إلى خطة التكلفة بالعناصر التي تتبع هيكل تجزئة العمل، والأتعاب والتراخيص، واحتياطي الطوارئ مقابل احتياطي الإدارة، وتكلفة المتر المربع، وخط أساس للتكلفة يُعتمد مع البرنامج الزمني
- 3.2Cash Flow and Interim Payments — the S-curve of planned spend and the client's funding plan, the advance payment and its recovery, retention and its release, and the interim payment certificate: measured, checked, certified and paid on the contract's dates · التدفق النقدي والمستخلصات — منحنى S للإنفاق المخطط وخطة تمويل المالك، والدفعة المقدمة واستردادها، ومحتجز الضمان والإفراج عنه، والمستخلص: يُقاس ويُراجَع ويُعتمد ويُصرف في مواعيد العقد
- 3.3Earned Value Management — planned value, earned value and actual cost at one date, the schedule and cost variances and indices (SPI and CPI), the forecast at completion (EAC, VAC, ETC and TCPI), and what earned value shows and what it does not · إدارة القيمة المكتسبة — القيمة المخططة والقيمة المكتسبة والتكلفة الفعلية في تاريخ واحد، وانحرافات ومؤشرات الجدول والتكلفة (SPI وCPI)، والتوقع عند الإنجاز (EAC وVAC وETC وTCPI)، وما تُظهره القيمة المكتسبة وما لا تُظهره
- 3.4Change Control and Variations — one path for every change, from the request and the impact assessment to the decision at the right level, the written instruction and the updated baselines, the change log, and contingency drawn down in the open against a change number · ضبط التغيير وأوامر التغيير — مسار واحد لكل تغيير، من الطلب وتقييم الأثر إلى القرار عند المستوى الصحيح والتعليمات المكتوبة وتحديث خطوط الأساس، وسجل التغيير، والسحب المعلن من احتياطي الطوارئ برقم تغيير
- 3.5Value Engineering and Cost Reporting — value as function divided by cost, the five steps of the value-engineering workshop, whole-life thinking, and the monthly cost report that sets the forecast against the approved budget and shows the headroom · الهندسة القيمية وتقارير التكلفة — القيمة كحاصل قسمة الوظيفة على التكلفة، والخطوات الخمس لورشة الهندسة القيمية، والنظر إلى تكلفة دورة الحياة كاملة، وتقرير التكلفة الشهري الذي يقارن التوقع بالموازنة المعتمدة ويُظهر الهامش المتاح
Procurement, Contracts & Risk
Procurement route · Tender evaluation · Contract data · Risk register · Claims🕒 10 training hours · 5 lessons · 10 ساعات تدريبيةThe budget is only as safe as the contracts that spend it and the risks around it. This module covers the procurement routes and who carries which risk; tendering, evaluation fixed before opening, and award; contract administration — securities, time terms, delay damages and notices; the risk register with probability, impact and expected monetary value; and risk responses, claims in project-management terms and the dispute ladder.
- 4.1Procurement Routes — the traditional (design–bid–build), design-and-build and management routes, who carries the design, price, time and coordination risk under each, lump-sum, remeasurement and cost-plus pricing, and choosing the route by the client's priorities · طرق التعاقد — الطريقة التقليدية (تصميم ثم مناقصة ثم تنفيذ) وطريقة التصميم والتنفيذ وطرق الإدارة، ومن يتحمل مخاطر التصميم والسعر والزمن والتنسيق في كل منها، والتسعير بالمبلغ المقطوع وإعادة القياس والتكلفة مضافًا إليها نسبة، واختيار الطريقة وفق أولويات المالك
- 4.2Tendering and Award — the tender documents, prequalification and the tender list, equal information to all bidders, evaluation criteria and weights fixed before opening, the technical and financial scores, and the tender report, the approval and the letter of award · المناقصة والترسية — مستندات المناقصة، والتأهيل المسبق وقائمة المتناقصين، ومعلومات متساوية لجميع المتناقصين، ومعايير وأوزان تقييم تُحدَّد قبل فتح المظاريف، والدرجتان الفنية والمالية، وتقرير المناقصة والاعتماد وخطاب الترسية
- 4.3Contract Administration — the contract documents and their order of priority, the Engineer as contract administrator, the securities and money terms, commencement, completion, extension of time and delay damages, and written notices inside the contract's period · إدارة العقد — مستندات العقد وترتيب أولويتها، والمهندس بصفته مدير العقد، والضمانات والشروط المالية، وبدء الأعمال والإنجاز وتمديد المدة وغرامة التأخير، والإخطارات المكتوبة خلال المدة التي يحددها العقد
- 4.4Risk Identification and Analysis — writing a risk as cause, event and effect, identifying risks through workshops, checklists and past projects, ranking them on the probability × impact matrix, the expected monetary value, and one owner for every risk · تحديد المخاطر وتحليلها — صياغة الخطر كسبب وحدث وأثر، وتحديد المخاطر عبر ورش العمل وقوائم المراجعة والمشروعات السابقة، وترتيبها على مصفوفة الاحتمال × الأثر، والقيمة النقدية المتوقعة، ومالك واحد لكل خطر
- 4.5Risk Response, Claims and Disputes — the four responses (avoid, transfer, reduce, accept) chosen by cost against benefit, a claim from the event and the notice to the records, the assessment and the determination, and the dispute ladder from negotiation to arbitration · الاستجابة للمخاطر والمطالبات والنزاعات — الاستجابات الأربع (التجنب والنقل والتخفيف والقبول) تُختار بمقارنة التكلفة بالعائد، والمطالبة من الواقعة والإخطار إلى السجلات والتقييم والقرار، وسلّم فض النزاعات من التفاوض إلى التحكيم
Delivery, Quality & Close-out
Inspection & test plan · Safety dashboard · Monthly report · Handover file · Final account🕒 10 training hours · 5 lessons · 10 ساعات تدريبيةWhat remains is to build it right and hand it over. This module follows the site to the end: quality planned in through the inspection-and-test plan, hold points and non-conformance reports; health, safety and environment with leading and lagging indicators; the one-page monthly report and meetings that decide; testing, commissioning, the snag list, practical completion and the handover file; and the final account, the scorecard against the charter and the lessons learned.
- 5.1Quality Management on Site — quality as meeting the specification, the quality plan and the inspection-and-test plan, hold points, inspection requests passed first time, and non-conformance reports closed by correcting both the work and its cause · إدارة الجودة في الموقع — الجودة هي مطابقة المواصفات، وخطة الجودة وخطة الفحص والاختبار، ونقاط التوقف، وطلبات الفحص المقبولة من المرة الأولى، وتقارير عدم المطابقة التي تُغلق بتصحيح العمل وسببه معًا
- 5.2Health, Safety and Environment — the client-side project manager's role against the contractor's control of the site, risk assessments, method statements, permits to work and toolbox talks, leading and lagging indicators, and the lost-time injury frequency rate · الصحة والسلامة والبيئة — دور مدير المشروع من جانب المالك مقابل سيطرة المقاول على الموقع، وتقييم المخاطر وبيان طريقة التنفيذ وتصاريح العمل والتوعية اليومية، والمؤشرات الاستباقية واللاحقة، ومعدل تكرار الحوادث المضيِّعة للوقت
- 5.3Progress Reporting and Meetings — the one-page monthly report on time, cost, quality, safety, risks and decisions needed, traffic lights with written thresholds, meetings that end in actions with an owner and a date, and bad news reported early with a recovery proposal · تقارير التقدم والاجتماعات — التقرير الشهري في صفحة واحدة عن الزمن والتكلفة والجودة والسلامة والمخاطر والقرارات المطلوبة، وإشارات ضوئية بحدود مكتوبة، واجتماعات تنتهي بإجراءات لكل منها مالك وتاريخ، وإبلاغ الخبر السيئ مبكرًا مع مقترح الاستدراك
- 5.4Testing, Commissioning and Handover — proving each system alone and then all systems together, the practical-completion inspection and the snag categories, the handover file, the release of retention, and the defects-liability period up to the final certificate · الاختبار والتشغيل التجريبي والتسليم — إثبات كل نظام منفردًا ثم الأنظمة مجتمعة، ومعاينة الاستلام الابتدائي وتصنيف الملاحظات، وملف التسليم، والإفراج عن محتجز الضمان، وفترة مسؤولية العيوب حتى الشهادة النهائية
- 5.5Close-out and Lessons Learned — the final account, the scorecard against the charter's success criteria, lessons learned recorded while the team is still together, closing the contracts and archiving the records, and the benefit check against the business case · إغلاق المشروع والدروس المستفادة — الحساب الختامي، وبطاقة النتائج مقابل معايير النجاح في الميثاق، والدروس المستفادة تُسجَّل والفريق ما زال مجتمعًا، وإغلاق العقود وأرشفة السجلات، ومراجعة العائد مقابل دراسة الجدوى
What You Will Be Able to Do
Every Lesson Ends with a Working Project Document
Twenty-five lessons, twenty-five documents — each one filled in for the fictional case and ready to be reused on your own project.
Initiation Pack
Stage-gate checklist, project brief sheet, stakeholder register and communication plan, RACI chart, authority matrix and a one-page charter.
Planning Pack
WBS dictionary sheet, activity list, critical-path table, milestone schedule with a levelling note, and the progress update with recovery options.
Cost-Control Pack
Cost-plan summary, interim payment certificate sheet, earned-value worksheet, change-request form with the change log, and the monthly cost report page.
Procurement & Contract Pack
Procurement-route selection matrix, tender-evaluation sheet, contract data summary and the claim notice checklist.
Risk Pack
The risk register with probability, impact, expected monetary value and owner, and the risk-response plan that tests cost against benefit.
Delivery & Close-out Pack
Inspection-and-test plan page, non-conformance log, safety dashboard, one-page monthly dashboard, practical-completion checklist, handover-file index and close-out report.
Study Online at Your Pace — or Have It Tailored to Your Company
📚 How You Study
طريقة الدراسة
- 100% online and self-paced on the COMFORT-CPD Academy platform, with 30-day access from enrolment. — أون لاين بالكامل وبوتيرة ذاتية على منصة الأكاديمية، مع إتاحة 30 يومًا من تاريخ التسجيل.
- Every lesson: an Arabic video plus an illustrated bilingual PDF (English left, Arabic right) with a visual guide and a 5-question self-scoring quiz. — لكل درس: فيديو بالعربية وملف PDF مصوّر ثنائي اللغة (الإنجليزية يسارًا والعربية يمينًا) فيه دليل بصري واختبار ذاتي التصحيح من 5 أسئلة.
- Each lesson ends with the working project document that step produces — a form, a register or a schedule, filled in for the fictional case. — ينتهي كل درس بمستند المشروع العملي الذي تُنتجه الخطوة — نموذج أو سجل أو جدول مملوء على المثال الافتراضي.
- 5 modules · 25 lessons · 10 training hours per module (50 in total) · Level 3 – Advanced · 5 CPD hours. — 5 وحدات · 25 درسًا · 10 ساعات تدريبية لكل وحدة (50 إجمالًا) · المستوى الثالث – متقدم · 5 ساعات تطوير مهني.
- Egyptian context in project-management terms, by law name only: the Civil Code (contract for works), the Building Law, the Labour Law, the Environment Law and the Arbitration Law — what the project manager must check and escalate; check the current text with the legal adviser; not legal advice. — السياق المصري بلغة إدارة المشروع وبأسماء القوانين فقط: القانون المدني (عقد المقاولة) وقانون البناء وقانون العمل وقانون البيئة وقانون التحكيم — ما يجب على مدير المشروع مراجعته وتصعيده؛ يُراجَع النص الساري مع المستشار القانوني؛ وليست استشارة قانونية.
- Prerequisites: none beyond basic spreadsheet skills; a background in engineering, architecture, cost or real estate is helpful but not required. — المتطلبات المسبقة: لا شيء سوى مهارات أساسية في جداول البيانات؛ والخلفية في الهندسة أو العمارة أو التكاليف أو العقارات مفيدة لكنها غير مشترطة.
- Course code COMFORT-CPD-PM-2026 · provider COMFORT-CPD Academy (Comfort360). — كود البرنامج COMFORT-CPD-PM-2026 · الجهة المقدمة أكاديمية كومفورت للتطوير المهني المستمر (كومفورت 360).
🏅 How You Are Assessed
نظام التقييم
- Complete the 25 lessons and their quizzes. — إكمال الدروس الخمسة والعشرين واختباراتها القصيرة.
- A.1 — Case study: the fictional office building followed through the five modules — the budget and the business case, the critical path, earned value at month 8, the tender scores and the risk register, and the close-out. — أ.1 دراسة حالة: المبنى الإداري الافتراضي يُتابَع عبر الوحدات الخمس — الموازنة ودراسة الجدوى والمسار الحرج والقيمة المكتسبة في الشهر الثامن ودرجات العطاءات وسجل المخاطر والإغلاق.
- A.2 — Applied test: five realistic situations and the decision to take — a verbal request to add work, a critical activity one month late, a lowest bid that is not the best bid, a price risk worth reducing and drawings issued late. — أ.2 اختبار تطبيقي: خمسة مواقف واقعية والقرار الواجب اتخاذه — طلب شفهي بإضافة أعمال، ونشاط حرج متأخر شهرًا، وأقل عطاء ليس أفضل عطاء، وخطر سعر يستحق التخفيف، ورسومات صدرت متأخرة.
- A.3 — Final exam: 20 multiple-choice questions — pass mark 75% (15 / 20), one attempt. — أ.3 الاختبار النهائي: 20 سؤال اختيار من متعدد — الحد الأدنى للنجاح 75% (15 من 20)، محاولة واحدة.
- Certificate: COMFORT-CPD Academy digital certificate of completion — Project Management – Level 3 — 5 CPD hours — unique verifiable ID — issued on passing the final exam. — الشهادة: شهادة إتمام رقمية من أكاديمية كومفورت «إدارة المشروعات – المستوى الثالث» بواقع 5 ساعات CPD وبرقم تحقق فريد تُصدر عند النجاح في الاختبار النهائي.
- Enrolment: add to cart, pay, receive your login details and start immediately. — التسجيل: أضف إلى السلة وأكمل الدفع واستلم بيانات الدخول وابدأ فورًا.
🏢 Tailored Programme for Your Company
برنامج تدريبي مخصص لشركتك
We design the programme around your needs. It covers the five modules — Initiation & Governance, Scope & Time Planning, Cost & Value Control, Procurement, Contracts & Risk, and Delivery, Quality & Close-out — with practical applications and working documents built on your own projects, contracts and procedures. Duration, cost and delivery mode (online or in-person) are set after we understand your needs precisely.
نصمّم البرنامج حسب احتياجك، ويشمل الوحدات الخمس — بدء المشروع والحوكمة، وتخطيط النطاق والزمن، وضبط التكلفة والقيمة، والتعاقد والعقود والمخاطر، والتنفيذ والجودة والإغلاق — مع تطبيقات عملية ومستندات عمل مبنية على مشروعاتكم وعقودكم وإجراءاتكم. المدة والتكلفة ونظام التدريب (أونلاين / حضوري) نحددها بعد معرفة احتياجك بدقة.
- 1Needs assessment with your projects leadتحليل الاحتياج مع مسؤول المشروعات لديكم
- 2Written proposal: scope, duration, mode and costعرض مكتوب: النطاق والمدة ونظام التدريب والتكلفة
- 3Delivery to your team and certificatesتنفيذ التدريب لفريقكم وإصدار الشهادات
A Certificate That Counts
Digital Certificate — 5 CPD Hours
Complete the 25 lessons, the case study and the applied test, then pass the 20-question final exam at 75% to receive the COMFORT-CPD Academy digital certificate of completion “Project Management – Level 3”, carrying 5 CPD hours and a unique verifiable certificate ID — recorded toward your annual CPD record.
أكمل الدروس الخمسة والعشرين ودراسة الحالة والاختبار التطبيقي، ثم انجح في الاختبار النهائي من 20 سؤالًا بنسبة 75% لتحصل على شهادة الإتمام الرقمية من أكاديمية كومفورت للتطوير المهني المستمر «إدارة المشروعات – المستوى الثالث»، بواقع 5 ساعات CPD وبرقم تحقق فريد — تُدرج ضمن سجل التطوير المهني السنوي.
Project Management Taught from the Owner's Side of the Table
Practice-Led
COMFORT-CPD Academy is the training arm of Comfort360, a property firm working in valuation, property and asset management and handover inspection in Egypt.
One Project, in Order
Not five separate topics but one building followed from the brief to the final account, so every number in a lesson comes from the lesson before it.
Documents You Can Use
Each lesson ends in a working form, register or schedule; the tailored programme rebuilds them on your own projects.
Verifiable CPD Certificates
Digital certificates with a unique verifiable ID, counted toward your annual CPD record.
Frequently Asked Questions
What is the difference between the online course and the tailored programme? · ما الفرق بين الدورة الأونلاين والبرنامج المخصص؟
Do I need to be an engineer or to have managed a project before? · هل يجب أن أكون مهندسًا أو أن أكون قد أدرت مشروعًا من قبل؟
Is the course tied to a specific planning or cost software? · هل البرنامج مرتبط ببرنامج تخطيط أو تكاليف محدد؟
Is it about the contractor's side or the client's side? · هل يتناول البرنامج جانب المقاول أم جانب المالك؟
Does the course give legal advice on construction contracts? · هل يقدّم البرنامج استشارة قانونية في عقود المقاولات؟
Are the documents and figures taken from a real project? · هل المستندات والأرقام مأخوذة من مشروع حقيقي؟
In which language is the course, and how long do I have? · ما لغة البرنامج وما مدة الإتاحة؟
How is the course assessed? · كيف يتم التقييم؟
Which other courses complement it? · ما البرامج المكمّلة؟
How do I enrol? · كيف أسجل في البرنامج؟
Plan It. Control It. Close It Out.
Five modules, 25 lessons, 50 training hours, one project followed from the brief to the final account, 25 working project documents, a case study, an applied test, a 20-question final exam and a digital certificate carrying 5 CPD hours. Join PM-L3 today — or ask for a programme tailored to your company.
خمس وحدات، و25 درسًا، و50 ساعة تدريبية، ومشروع واحد من الموجز إلى الحساب الختامي، و25 مستند مشروع عمليًا، ودراسة حالة، واختبار تطبيقي، واختبار نهائي من 20 سؤالًا، وشهادة رقمية بواقع 5 ساعات CPD. انضم اليوم إلى PM-L3 — أو اطلب برنامجًا مخصصًا لشركتك.